NBN Relocations: Moving Your Connection Point the Right Way

By CoreComms 10 min read Updated 5 August 2026

Key takeaways

  • The process and timeframes for relocating a connection point differ across FTTP, FTTC, FTTN and HFC.
  • Internal cabling changes generally need an ACMA-registered cabler; network-side changes go through your provider and NBN Co.
  • Renovations and extensions should be scheduled with connection point movement in mind, not as an afterthought.
  • Business premises need a continuity plan for any outage window during the switch.
  • Confirm technology-specific detail and lead times with your provider, since NBN Co processes can change and vary by address.

Moving house or reconfiguring an office often means moving where the internet connection physically lands. That point, generally referred to as the connection point, is the boundary between the carrier network and the cabling inside your premises. Shifting it is not always as simple as unplugging a box and plugging it back in somewhere else.

The right approach depends heavily on which NBN access technology serves the address, whether the work is inside the boundary of the property or requires changes further up the network, and whether a registered cabler needs to be involved. This guide walks through the moving parts so you know what to plan for and what to confirm with your provider before work starts.

Why relocations happen

Relocations are usually triggered by one of a handful of situations: moving to a new premises where an existing service needs to be recognised, extending or renovating a building so the connection point ends up in an impractical spot, or reconfiguring an office layout so the comms room or utility area moves to a different part of the floor.

In each case the goal is the same: get the network boundary point somewhere sensible for the cabling that follows it, without creating a dead zone or an ugly cable run across a newly renovated space. It pays to think about this early, because retrofitting a relocation after finishes are done is more disruptive and more expensive than planning it into the works.

What differs by access technology

Not all NBN connections are built the same way, and that has a direct effect on what a relocation involves. Fibre to the Premises (FTTP) uses a fibre lead-in running to an NBN-supplied network device inside the building, so moving the connection point can mean a physical fibre relocation. Fixed Wireless and HFC connections have their own equipment and cabling arrangements again.

Fibre to the Curb (FTTC) and Fibre to the Node (FTTN) rely on the existing copper phone line running from a street pit or pillar into the premises, so relocating the internal connection point is often a matter of internal copper or cabling changes rather than anything happening in the street. Because the detail varies and can change, always confirm with your provider which technology applies to your address and what their specific relocation process requires.

Fixed Wireless and HFC considerations

Fixed Wireless connections depend on line of sight to a transmission facility, so an outdoor antenna cannot simply be moved to any wall of the building; its position is constrained by signal path. HFC connections use the pay TV style coaxial cable network, so a relocation may involve new coaxial runs rather than copper or fibre.

Internal work versus network-side work

It helps to think of a relocation as having two halves. One half is anything from the property boundary or the NBN equipment inward, which is internal cabling and generally falls to a registered cabler working on your instruction. The other half is anything involving the carrier's network itself, which goes through your internet provider and, where relevant, NBN Co.

Getting these two halves in the right order matters. There is little point booking a cabler to run new internal cable to a spot before you know whether the network-side change has been approved, and there is little point waiting on the network-side change if the internal cabling and power at the new location has not been sorted.

The registered cabler requirement

Cabling work inside a premises that connects to a telecommunications network is regulated under ACMA rules, and in most cases this cabling must be performed by an appropriately registered cabler. This applies whether the job is running a new lead-in path to a relocated wall plate, extending cabling to a new comms cupboard, or reworking a data cabling layout to suit the new connection point.

Using a registered cabler is not just a compliance box to tick. It also means the work is carried out to recognised cabling standards such as AS/CA S009 and AS/NZS 3080, which reduces the chance of interference, poor performance, or having to redo work later because it was not fit for purpose.

Planning the new location

Before any cable is run, it is worth spending real time deciding where the connection point and the associated equipment should actually sit. Good candidates are usually a dedicated comms cupboard, a garage, or a study, somewhere with power nearby, reasonable airflow, and not directly exposed to weather or damp.

Avoid locations that will be hard to access later for fault-finding, and avoid spots that will end up hidden behind built-in furniture once the fit-out is finished. A little forward planning here saves a great deal of frustration if a technician needs to attend for a fault six months down the track.

  • Choose a location with power already available or easy to add
  • Keep clear access for future fault-finding or upgrades
  • Avoid garages prone to damp, dust or extreme heat where possible
  • Plan cable pathways before wall linings or cabinetry go in
  • Consider proximity to where most devices and access points will sit

Need this done properly?

Talk to a registered cabler in South East Queensland

CoreComms designs, installs, tests and documents commercial cabling and network infrastructure across Brisbane, the Gold Coast, Logan, Ipswich and Toowoomba. Tell us what you are planning and we will scope it properly.

Cabling and power considerations

Once the new location is chosen, internal cabling needs to be run to support it. This typically means a data cable or extended copper/fibre pathway from the new connection point through to where the router or main switch will live, plus dedicated general power at that location so equipment is not sharing an overloaded circuit or running off an extension lead.

If the relocation is happening as part of a broader fit-out, it is efficient to have the same cabling team handle the data cabling for the rest of the property at the same time, so pathways, containment and labelling are consistent throughout rather than patched together in stages.

Timing around renovations

Renovations are one of the most common reasons a connection point needs to move, and they are also where poor timing causes the most pain. If the relocation is left until after walls are re-lined and floors are finished, cabling work becomes invasive, involves surface-mounted cable, or requires reopening finished surfaces.

The better approach is to involve a cabler during the design or early construction phase, alongside the electrician, so pathways for the relocated connection can be roughed in before linings go up. This is the same logic used for power and lighting circuits, and telecommunications cabling deserves the same early consideration.

Business continuity during the switch

For a business premises, an NBN relocation is not just a technical exercise, it is an operational risk if not planned carefully. A connection outage during business hours can affect EFTPOS, cloud accounting, VoIP phones and staff productivity all at once.

Where possible, schedule the switch outside trading hours, confirm expected outage windows with your provider in advance, and have a fallback plan such as a mobile hotspot for essential functions during the transition. Businesses with more than one site or that cannot tolerate downtime should also ask their provider about options for staging the cutover.

Preparing before the technician arrives

A smooth relocation appointment depends on preparation on your end. Having the new location cleared, powered and accessible before the technician or cabler arrives avoids wasted callouts and rescheduling. It also helps to have any existing account or service details on hand in case they are needed on site.

  • Confirm the exact new location with your cabler and provider beforehand
  • Clear access to both the old and new locations
  • Ensure power is available at the new location
  • Have account details or previous correspondence with your provider ready
  • Ask about expected downtime and plan around it

Frequently asked questions

Can I move my NBN connection point myself?

Internal cabling that connects to the telecommunications network generally needs to be carried out by an ACMA-registered cabler, so a DIY relocation is not advisable and may not be compliant. Network-side changes are handled by your provider. Always confirm what applies to your specific situation before starting any work.

How long does an NBN relocation take?

Timeframes vary depending on the access technology at your address, whether network-side changes are needed, and provider scheduling. Some relocations are straightforward internal cabling jobs completed in a single visit, while others require coordination with your provider over a longer period. Confirm expected timing directly with your provider.

Does the process differ between FTTP and FTTN?

Yes. FTTP relies on fibre running to an NBN-supplied device, while FTTC and FTTN rely on the existing copper line into the building. This affects what kind of cabling work is involved in a relocation. Confirm with your provider which technology serves your address and how their relocation process applies to it.

Do I need a registered cabler for a small internal move?

Even a short internal relocation, such as moving a wall plate a few metres, typically involves cabling connected to the telecommunications network and falls under the same registered cabler requirements as larger jobs. It is best treated the same way as any other internal cabling work for compliance and quality reasons.

What happens to my internet during the relocation?

There is usually some period without service while cabling is changed over or network-side updates take effect. The length of any outage depends on the technology and scope of work. For business premises, it is worth scheduling the work for a low-impact time and discussing expected downtime with your provider in advance.

Should I relocate before or after a renovation?

Ideally before finishes are completed. Involving a cabler during the design or early construction phase allows pathways to be roughed in before walls are lined, avoiding invasive work or surface-mounted cabling later. Leaving it until after the renovation is finished generally makes the job more disruptive and costly.